Tasks

Updated 1 month ago by Stephanie Krenz

In the task overview, you will find the following information in the table (you may have to select them in the column selection at the top right):

  1. Task name
  2. Task type: Extract, Analyze, Replication
  3. Status: Success, Failure
  4. Next Run: If the task has been scheduled repeatedly
  5. Schedule: Displays the interval at which the Task is scheduled - Immediately, Daily, Weekly, Monthly, Real-Time
  6. Runs (All): Shows the number of Runs completed in this Task
  7. Task created by: Task Creator
  8. Workspace name
  9. Scheduled: yes = tick, no = X
  10. Task created at: Date and Time
  11. First Run: Date and Time of the first Run
  12. Latest Run: Date and Time of the most recent Run
  13. Success Rate (All): Success rate of all Runs in this Task
  14. Sucess Rate (Scope): Success rate - with filtered period
  15. Runs (Scope): Number of Runs - with filtered period
  16. Average Duration (Scope): Average duration of all Runs - with filtered time period
  17. Total Duration (All): Total duration of all Runs
  18. Total Duration (Scope): Total duration of all completed Runs - with filtered time period
  19. SAP System
  20. SQL Server
  21. SQL Database
  22. Connection: Fabric Mirror Data, Fabric Lakehouse, Snowflake
  23. Forecasted Data Volume: Expected amount of data for the next Run
  24. Forcasted Duration: Expected duration of the next Run
  25. Data Volume (All): Total data volume of all Runs in this Task
  26. Data Volume (Scope): Total data volume of all Runs in the Task - with filtered time period